Customization: | Available |
---|---|
Certification: | ISO9001, CE, SGS |
Application: | Turbine Oil, Lubricant Oil, Engine Oil, Gear Oil, Dirty Diesel Oil |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name: 2024 New Product Waste Engine Oil Distillation Plant To Diesel Refinery Machinery Equipment
Index | Unit | DZC-1 | DZC-3 | DZC-5 |
Capacity | T/Day | 1 | 3 | 5 |
Recovery rate | % | ≥ 90 | ||
Working temperature | ºC | 110~420 | ||
Working Pressure | Mpa | ≤ 0.4 | ||
Heating Power | kW | 35 | 60 | 75 |
Motor Power | kW | 43 | 70 | 90 |
Power Supply | 380V,50HZ, 3PH(Optional) | |||
Plant Dimension | m | 4*2.5*5 | 5*3*5.5 | 6*3*6 |
Weight | Kgs | 3000 | 4000 | 5500 |
Final products | Ratio Percentages | Distillation temperature | Vacuum Value |
Water | 2% |
80ºC-110ºC
|
-0.098 |
Gasoline and diesel | 8% |
120ºC-210ºC
|
500Pa |
Light base oil | 40% |
220ºC-290ºC
|
50~500 Pa
|
Heavy base oil (Viscosity ≥SN150 ) | 45% |
300ºC-350ºC
|
50~500 Pa
|
Oil Residual | 5% | ||
Total | 100% |
Service Commitment:
CHONGQING NAKIN ELECTROMECHANICAL CO.,LTD will always adhere to the business philosophy of "Responsible for product, Responsible for user, Responsible for sell", keep the faith to create the national brand, keep innovation, keep improving and keep making the high quality oil purifier&oil filtration products with first-class after-service for getting the customer's trust and love. Really build a new era in Brand-NAKIN with customers.
Question1. What's the Working Process of the waste oil recycling machine ?
Answer: You can find the answer in the picture. If you want to get more details, please send me an inquiry.
Q2. What is your packing method?
A: Generally, our goods packed by wooden case. And machines of different capacities need to be packed into containers of different specifications. For example, a 1 ton per day machine requires a 40'HQ container.
Q3. What is your terms of payment?
A: Usually, we use T/T.
Q4. How about your delivery time?
A: Generally, for small capacity machine like 1 ton per day, it will take 30 days after receiving your advance payment. The specific delivery time depends on the capacity and the quantity of your order.
Q5. Can you customized goods for us?
A: Yes, we can customized by your samples or technical drawings.
Q6. If you have any inspection or test for your goods before delivery?
A: Yes, we do the inspection and test before finished goods. If you have a designated third-party quality inspection agency, we can also accept their testing.
Q7. Can we visit your factory?
A: Yes, we warmly welcome your visiting, and can pick up you at airport or train station.