Customization: | Available |
---|---|
Certification: | ISO9001, CE, SGS |
Application: | Turbine Oil, Lubricant Oil, Transformer Oil, Engine Oil, Gear Oil, Dirty Diesel Oil |
Still deciding? Get samples of US$ 8000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name: Engine Oil Production Line Used Oil Recycling Machine Used Oil To Base Oil Machine
4.Using the special chemicals to catalyze the waste oil, which makes sure the final diesel oil,
gasoline oil and base oil are good anti-oxidation with good color, there is no bad odor.
The final oil can be storage for one year without color change and odor change.
Index | Unit | JZC-1 | JZC-3 | JZC -5 | JZC -10 |
Capacity | Ton / day | 1 | 3 | 5 | 10 |
Recovery ratio | % | Above 93% | |||
Working pressure | MPa | ≤ 0.4 | |||
Working vacuum | MPa | -0.08 ~ -0.0998 | |||
Working Temperature | ºC | 80-350 | |||
Working Noise | dB (A) | 75 | |||
Power supply | V | 380v, 50hz, 3Phase (Or According user demand) | |||
Heating way |
Electromagnetic / Electric Heater or boiler
( fuel, natural gas or coal)
|
||||
Pump Motor Power | kW | 10 | 18 | 20 | 25 |
Working Size | M | 5*2.5*4 | 7*2.8*4.5 | 8*3.2*5 | 15*4*6 |
Certificates & Honors:
China Famous Brand Oil Purifier Company
Golden-supplier for China National Electric Power Group
ISO9001 products quality certificate
CE Products safety certificate
SGS Products local testing report
More than 15 years and 50 countries and districts exporting experience
Question 1. Are you a manufacturer or a trading company?
Answer: We are a manufacturer with more than 10 years of experience in manufacturing and we have our own factory.
Question 2. How is your quality and price?
Answer: We know the market competition is fierce, so we are trying our best to lower the cost; but at the same time, quality is always the
first priority in our company.
We will never sacrifice quality for any reason, this is our bottom line.
Question 3. How about your delivery time?
A: Generally, for a 1 ton per day machine, it will take about 30 working days after receiving your advance payment. The specific delivery time depends on the capacities and the quantity of your order.
Question 4. Can we visit your factory?
A: Yes, we warmly welcome your visiting, and can pick you up at airport or train station.